| Courses Others | Locality Jayadev Vihar |
Estimation determines the probable construction cost of a project. First estimation is done before construction starts for the purpose of making budget of the project or bidding the project as a contractor. Estimation also done during construction, for billing and material reconciliation.For estimate, an estimator needs complete set of drawing and project related information. This estimate shows required materials, labor, complete cost details and overhead and also contractor profit.
Building Estimation:
Understanding the role of a Civil Engineer.
Methods of Estimation
Quarry chart preparation
Lead Statement concept
Rate Analysis of all civil works
Specifications
Drawing Study
Quantity calculation as per structural & Architectural Drawing
All calculations using Excel Sheet
Material reconciliation
Billing of civil works
Bar Bending schedule
Bill of Quantity (BoQ) preparation
Road Estimation:
Traffic Survey
Traffic Analysis
MSA Calculation
Pavement Design
Site Clearance
Quantity Calculation of Embankment
Quantity Calculation of Sub-grade
Quantity Calculation of pavement layers
Earthwork Calculation of road/VUP/PUP
Quantity Calculation of (New Road)
Quantity Calculation (Widening Road)
Quantity Calculation of RCC Drain
Quantity Calculation of Toll Plaza