| Course Others | You are Offering Professional Course | Locality Laxmi Nagar |
Introduction to SEEVILL Quantity Surveying and Role of Quantity Surveyors in the construction Industry.
A brief study of construction materials, Nomenclature of items.
Identification of construction activities and report generation
Identification and generation of all types of project risks and action report
Understanding and Reading the Structural and Architectural Drawings
Basic QA and QC Techniques used in the Construction Industry
Quantity takes off from the structural and architectural drawings (Brickwork, Plaster, Painting, Putty work, Shuttering, PCC, RCC, Interior work, drains, Canal ETC.).
Preparation of estimation sheets for all kinds of building and Road works on Ms-Excel.
Management Information System (MIS) generation and preparation in proper formats as per IS Standard.
Estimation of all kinds of civil works (Brickwork, Plaster, Painting, Putty work, Shuttering, PCC, RCC, Interior work, drains, Canal, Roads ETC.)
Estimation Procedure during the design phase by the client.
Estimation Procedure during Pre-Construction phase by a contractor.
Estimation Procedure during the execution of work at the site.
Estimation of PEB building (Pre-engineered Building)
Costing of all kinds of civil works (Brickwork, Plaster, Painting, Putty work, Shuttering, PCC, RCC, Interior work, Demolishing works drains, Canal, Roads ETC.)
Calculator making on Ms-Excel (PCC Work, RCC Work, shuttering, concrete work, Interior work etc.)
Bar Bending schedule of technique from all RCC Structures (Footings, Beams, Columns, Slabs, Staircase, RCC Wall and water tank etc) from live project drawings.
BBS Sheet preparation techniques on Ms-Excel.
Labour Deployment Plan as per Budget
Labour Output Analysis as Per IS code, schedule of Rates
Machinery Output Analysis As per Market Standard
Profit and Loss Analyses in Labour and Machinery
S- Curve Reporting.
Daily work report and Daily progress report preparation as per quantity surveyor slandered
Analysis of Rate as per DAR & Market rate.
Material Reconciliation Techniques.
Material Procurement Strategies as per as the Techniques uses in Quantity Surveying.
Bill of Quantities (Preparation and Material take Off)
Management Of EOQ (Economic Order Quantity), Danger Level of Material, Re-Order Level.
One Live Project Training Through Drawing
Free Lance Quantity Surveying