| Category Interior Designer | Locality Anandapuram |
All the raw materials required by the unit are available throughout the year. The raw material can also be procured from the nearby districts and from other states. The stock and procurement period proposed in this scheme is for a period of 10 days. The details of requirement for 100% capacity utilization in the unit are tabulated as below. The raw material required by the unit is proposed to be arranged through local distributors.Concrete is a mixture of ordinary Portland cement, mineral aggregate (sand and stone chips) and water. The water used in preparing the concrete serves two purposes: (1) It combines
with the cement to form a hardened paste